deck refinishing los angeles

queen reopens cutty sark in greenwich

queen elizabeth ii and prince philip, duke of edinburgh, attend the opening of the restored cutty sark tea clipper at greenwich on april 25, 2012, in london.

pearl harbor attack anniversary

dec. 7, 2012, marks the 71st anniversary of the japanese attack on the u.s. naval base in pearl harbor, hawaii, that killed thousands of people and launched the united states into world war ii.

celebrity circuit

actors doris roberts and patricia heaton attend the official launch party of britweek at a private residence in hancock park 2012 on april 24, 2012, in los angeles.next: jeri ryan

rare color photos: 1940s working women

learning how to determine latitude by using a sextant is senta osoling, student at polytechnic high school, los angeles, calif. navigation classes are part of the school's program for training its

queen reopens cutty sark in greenwich

britain's queen elizabeth ii receives flowers from the public during a visit to reopen the tea clipper cutty sark in greenwich, east london, on april 25, 2012.

intrepid's back in town

about 400 guests and former crew members rode along, mingling on the flight deck in 60-degree weather. a tugboat fleet generating about 18,000 horsepower, said a stiff westerly wind helped guide

photographing the labor of bridge builders

after a month-long repair to re-open the span, it was determined that a long-term solution was needed to replace the double-deck cantilever bridge. a new span, featuring a single-tower suspension

the united states' fighting ships, from smallest to largest

the 'quiet, fast, and well-armed' submersibles in the seawolf class were designed to replace the aging los angeles-class fleet of submarines. but its high cost $3 billion to 3.5 billion each and

atlantis mission sts-117

the completed repair work to a torn thermal blanket that helps protect the shuttle from heat on its return flight to earth is seen sunday, june 17, 2007.

photographing the labor of bridge builders

after a month-long repair to re-open the span, it was determined that a long-term solution was needed to replace the double-deck cantilever bridge. a new span, featuring a single-tower suspension

pearl harbor attack anniversary

wreckage of a japanese plane, which crashed into one of the cranes, is seen on the deck of the u.s. seaplane tender, curtiss. in addition, the curtiss was damaged by a bomb explosion on the main

dangerous decks beneath our feet

'we estimate that at least 50 percent of decks out there, approximately 20 million decks, need some type of repair or replacement,' said ricardo arevelo, a structural engineer for simpson strong-tie.

queen reopens cutty sark in greenwich

queen elizabeth ii and prince philip, duke of edinburgh, walk on deck during a visit to the cutty sark on april 25, 2012, in greenwich, london. credit: wpa pool/getty images

Copyright © 2011-.Shanghai Seven Trust Industry Co.,Ltd All Rights Reserved.